Railway bridge across the Rhine

06-07-2004 Low-noise railway bridge thanks to glueing package from Bolidt

By applying sandwich sheeting to the railway bridge at Oosterbeek, sound pollution is greatly reduced. Bolidt developed the glueing package: Bolicast RI, Bolidense HLM strips and Bolidense injection mass.

Archives

Safed for later

Recently viewed

Bolidt home